What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| 08SO102509 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Battle WTW | Due 2026-27 | Brede |
| 08SO102682 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor BATTLE WWTW | Due 2026-27 | Brede |
| 08SO102532 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Fairlight WTW | Due 2026-27 | FAIRLIGHT |
| 08SO102742 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor FAIRLIGHT WWTW | Due 2026-27 | Marsham and Pannel Sewers |
| 08SO102746 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor FERRY HILL WINCHELSEA WWTW | Due 2026-27 | Brede |
| 08SO102449 · a | U_MON4 | Monitoring | U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils Ferry Hill WTW | Due 2026-27 | Brede |
| 08SO102490 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Guestling Green WTW | Due 2026-27 | GUESTLING GREEN |
| 08SO102765 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor GUESTLING GREEN WWTW | Due 2026-27 | Marsham and Pannel Sewers |
| 08SO102568 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring ICKLESHAM WTW | Due 2026-27 | ICKLESHAM |
| 08SO102785 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor ICKLESHAM WWTW | Due 2026-27 | Brede |
| 08SO102569 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring IDEN WTW | Due 2026-27 | IDEN |
| 08SO102525 · a | U_MON4 | Monitoring | U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils Staplecross WTW | Due 2026-27 | STAPLECROSS |
| 08SO102887 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor STAPLECROSS WWTW | Due 2026-27 | Tillingham |
| 08SO102543 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Stubbs Lane Brede WTW | Due 2026-27 | STUBBS LANE BREDE |
| 08SO102896 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor STUBBS LANE BREDE WWTW | Due 2026-27 | Brede |
| 08SO102592 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring WESTFIELD WTW | Due 2026-27 | Doleham Ditch |
| 08SO102924 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor WESTFIELD WWTW | Due 2026-27 | Doleham Ditch |
| 08SO101079 · a | WFD_NDLS_Chem2 | No deterioration | Prevent any deterioration Battle WTW | Due 2026-27 | Brede |
| 08SO104950 · qi | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact FAIRLIGHT SSO | Due 2027-28 | Marsham and Pannel Sewers |
| 08SO104950 · qy | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact GUESTLING GREEN SSO | Due 2027-28 | Marsham and Pannel Sewers |
| 08SO104950 · ps | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact STUBBS LANE BREDE SSO | Due 2027-28 | Brede |
| 08SO103819 · a | WFD_INV | Investigation | Investigations for actions to improve water quality in terms of relevant WFD status objectives. UDIMORE WTW | Due 2027-28 | Brede |
| 08SO104950 · qh | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact WESTFIELD SSO | Due 2027-28 | Doleham Ditch |
| 08SO104037 · a | WFD_ND | No deterioration | Amend WFD ND BOD permit BATTLE | Due 2029-30 | Brede |
| 08SO104037 · b | WFD_ND | No deterioration | Amend WFD ND Total P permit BATTLE | Due 2029-30 | Brede |
| 08SO101079 · b | WFD_ND_CHEM3 | No deterioration | Prevent any deterioration Battle WTW | Due 2029-30 | Brede |
| 08SO104120 · a | WFD_ND | No deterioration | Amend Ammonia permit FAIRLIGHT | Due 2029-30 | FAIRLIGHT |
| 08SO103921 · a | EnvAct_IMP2 | Improvement | SuDS + Storage FAIRLIGHT SSO | Due 2029-30 | Marsham and Pannel Sewers |
| 08SO104709 · a | WFD_IMPg | Improvement | Amend total P permit Ferry Hill Winchelsea | Due 2029-30 | FERRY HILL WINCHELSEA |
| 08SO103724 · a | WFD_IMPm | Improvement | Amend Total P permit GUESTLING GREEN | Due 2029-30 | GUESTLING GREEN |
| 08SO103925 · a | EnvAct_IMP2 | Improvement | SuDS + Storage GUESTLING GREEN SSO | Due 2029-30 | Marsham and Pannel Sewers |
| 08SO104050 · a | WFD_IMPm | Improvement | Amend Total P permit ICKLESHAM | Due 2029-30 | ICKLESHAM |
| 08SO104100 · a | WFD_IMPm | Improvement | Amend Total P permit STAPLECROSS | Due 2029-30 | STAPLECROSS |
| 08SO104052 · a | WFD_ND | No deterioration | Amend WFD ND Total P permit STUBBS LANE BREDE | Due 2029-30 | STUBBS LANE BREDE |
| 08SO104053 · a | WFD_IMPm | Improvement | Amend Total P permit WESTFIELD | Due 2029-30 | Doleham Ditch |
| 08SO104069 · a | WFD_IMPg | Improvement | Amend Total P permit WINCHELSEA BEACH | Due 2029-30 | Brede |
| 08SO103915 · a | EnvAct_IMP2 | Improvement | Wetland + Lining STUBBS LANE BREDE SSO | Due 2034-35 | Brede |
| 08SO103920 · a | EnvAct_IMP2 | Improvement | SuDS + Storage WESTFIELD SSO | Due 2034-35 | Doleham Ditch |
38 of 38 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.