← Bridge House, Colyford

Spill evidence · River Hub

Bridge House, Colyford

Combined sewer overflow · SBB00154 · feeds COLYTON & COLYFORD STW
Wet weather

The discharge

Spill day
Saturday, 17 February 2024
Started
17 Feb 2024, 18:07
Ended
19 Feb 2024, 13:38
Duration
1 day 19 hours
Receiving water
Umborne Brook
Parish
Colyford

Rainfall evidence

Daily rainfall at the matched gauge (Beer Quarry Lane) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
17/02/2024 (spill day)38.6 mmrain
16/02/20243 mmrain
15/02/202418.5 mmrain
14/02/20244.3 mmrain
13/02/20245.9 mmrain

River flow that day: 14.768 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 5.2 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
EA annual return (2024)
86 counted spills · 945 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00154). Rainfall: EA Hydrology gauge 4105d4aa-f7bd-4a61-a98d-3b40f7624380. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Axe & Lim Data.