← Axmouth pumping station

Spill evidence · River Hub

Axmouth pumping station

Pumping station overflow · SBB00059 · feeds SEATON STW
No rain data

The discharge

Spill day
Saturday, 24 October 2020
Started
24 Oct 2020, 20:40
Ended
24 Oct 2020, 20:59
Duration
19 minutes 1 second
Receiving water
Umborne Brook
Parish
Axmouth

Rainfall evidence

Daily rainfall at the matched gauge (Beer Quarry Lane) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
24/10/2020 (spill day)no data
23/10/2020no data
22/10/2020no data
21/10/2020no data
20/10/2020no data

River flow that day: 7.566 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 4.6 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Seaton (Devon)
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00059). Rainfall: EA Hydrology gauge 4105d4aa-f7bd-4a61-a98d-3b40f7624380. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Axe & Lim Data.