← Axmouth pumping station

Spill evidence · River Hub

Axmouth pumping station

Pumping station overflow · SBB00059 · feeds SEATON STW
Wet weather

The discharge

Spill day
Monday, 24 February 2025
Started
24 Feb 2025, 11:46
Ended
24 Feb 2025, 12:03
Duration
17 minutes 32 seconds
Receiving water
Umborne Brook
Parish
Axmouth

Rainfall evidence

Daily rainfall at the matched gauge (Beer Quarry Lane) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
24/02/2025 (spill day)14.1 mmrain
23/02/202530.3 mmrain
22/02/20250.6 mmrain
21/02/20253.7 mmrain
20/02/20256.4 mmrain

River flow that day: 22.744 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 4.6 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Seaton (Devon)
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
EA annual return (2025)
36 counted spills · 106 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00059). Rainfall: EA Hydrology gauge 4105d4aa-f7bd-4a61-a98d-3b40f7624380. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Axe & Lim Data.