← Clapton pumping station, Crewkerne

Spill evidence · River Hub

Clapton pumping station, Crewkerne

Pumping station overflow · SBB00270 · feeds CLAPTON BRIDGE_STW_CREWKERNE
No rain data

The discharge

Spill day
Friday, 18 December 2020
Started
18 Dec 2020, 14:40
Ended
19 Dec 2020, 07:01
Duration
16 hours 21 minutes
Receiving water
Upper Axe
Parish
Wayford

Rainfall evidence

Daily rainfall at the matched gauge (South Perrott) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
18/12/2020 (spill day)no data
17/12/2020no data
16/12/2020no data
15/12/2020no data
14/12/2020no data

River flow that day: 66.178 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.3 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00270). Rainfall: EA Hydrology gauge a6860273-cf43-41ce-bf4e-1fa17257862b_398493. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Axe & Lim Data.
Spill evidence — Clapton pumping station, Crewkerne — Axe & Lim Data