← Clapton pumping station, Crewkerne

Spill evidence · River Hub

Clapton pumping station, Crewkerne

Pumping station overflow · SBB00270 · feeds CLAPTON BRIDGE_STW_CREWKERNE
Wet weather

The discharge

Spill day
Saturday, 23 November 2024
Started
23 Nov 2024, 23:40
Ended
24 Nov 2024, 00:12
Duration
31 minutes 50 seconds
Receiving water
Upper Axe
Parish
Wayford

Rainfall evidence

Daily rainfall at the matched gauge (South Perrott) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
23/11/2024 (spill day)33.4 mmrain
22/11/202410.4 mmrain
21/11/20248.4 mmrain
20/11/20241.2 mmrain
19/11/20242 mmrain

River flow that day: 92.209 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.3 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2024)
9 counted spills · 41 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00270). Rainfall: EA Hydrology gauge a6860273-cf43-41ce-bf4e-1fa17257862b_398493. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Axe & Lim Data.