← Colyford pumping station

Spill evidence · River Hub

Colyford pumping station

Pumping station overflow · SBB00290 · feeds COLYTON & COLYFORD STW
Wet weather

The discharge

Spill day
Monday, 9 March 2026
Started
9 Mar 2026, 00:00
Ended
9 Mar 2026, 00:31
Duration
30 minutes 10 seconds
Receiving water
Umborne Brook
Parish
Colyford

Rainfall evidence

Daily rainfall at the matched gauge (Beer Quarry Lane) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
09/03/2026 (spill day)0.2 mmdry
08/03/20264.8 mmrain
07/03/20261.7 mmrain
06/03/20260.1 mmdry
05/03/20260.4 mmrain

River flow that day: 5.954 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 5.2 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00290). Rainfall: EA Hydrology gauge 4105d4aa-f7bd-4a61-a98d-3b40f7624380. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Axe & Lim Data.
Spill evidence — Colyford pumping station — Axe & Lim Data