What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| 08SW104906 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) CHILLINGTON + FROGMORE STW | Due 2026-27 | Avon (DevonTidal) and Sth Hams - Frogmore |
| 08SW104905 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) CHILLINGTON + FROGMORE STW | Due 2026-27 | Avon (DevonTidal) and Sth Hams - Frogmore |
| 08SW104856 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) EAST ALLINGTON STW | Due 2026-27 | Small Bk |
| 08SW104857 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) EAST ALLINGTON STW | Due 2026-27 | Small Bk |
| 08SW104745 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Loddiswell STW | Due 2026-27 | Avon - Lower |
| 08SW104746 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Loddiswell STW | Due 2026-27 | Avon - Lower |
| 08SW104634 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) South Brent STW | Due 2026-27 | Avon - Upper |
| 08SW104633 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) South Brent STW | Due 2026-27 | Avon - Upper |
| 08SW100020 · b | WFD_NDINV_WRHMWB | Investigation | Investigation to assess whether current compensation flow poses a risk to deterioration in the downstream waterbody. Upper Avon | Due 2026-27 | Upper Avon |
| 08SW100058 · a | HD_INV | Investigation | Investigation into the effect of an effluent recycling scheme Christchurch WRC and Holdenhurst WRC effluent recycling scheme | Due 2027-28 | Avon - Lower |
| 08SW104999 · cv | EnvAct_INV4 | Investigation | Investigation to meet EnvAct INV4 Driver NORTH SANDS SPST_PSCSOEO_SALCOMBE | Due 2027-28 | NORTH SANDS SPST_PSCSOEO_SALCOMBE |
| 08SW100503 · a | SW_ND | No deterioration | 10 Spills 50m3 aggregated CHILLINGTON SPS_PSCSOEO_CHILLINGTON | Due 2027-28 | CHILLINGTON SPS_PSCSOEO_CHILLINGTON |
| 08SW100503 · c | SW_ND | No deterioration | 10 Spills 50m3 aggregated CHILLINGTON STW_SSO_CHILLINGTON | Due 2027-28 | CHILLINGTON STW_SSO_CHILLINGTON |
| 08SW100503 · d | SW_ND | No deterioration | 10 Spills 50m3 aggregated MEADOWSIDE CHILLINGTON_CSO | Due 2027-28 | MEADOWSIDE CHILLINGTON_CSO |
| 08SW100503 · e | SW_ND | No deterioration | 10 Spills 50m3 aggregated SHERFORD STW_SO_SHERFORD | Due 2027-28 | SHERFORD STW_SO_SHERFORD |
| 08SW101455 · a | EnvAct_IMP3 | Improvement | Reduction of spills to meet EnvAct_IMP drivers COMMINUTOR HOUSE GOULD RD_CSO_SALCOMBE | Due 2029-30 | COMMINUTOR HOUSE GOULD RD_CSO_SALCOMBE |
| 08SW101466 · a | EnvAct_IMP3 | Improvement | Reduction of spills to meet EnvAct_IMP drivers DITCH END S T_PSCSOEO_EAST PORTLEMOUTH | Due 2029-30 | DITCH END S T_PSCSOEO_EAST PORTLEMOUTH |
| 08SW101565 · a | EnvAct_IMP2 | Improvement | Reduction of spills to meet EnvAct_IMP drivers NORTH SANDS SPST_PSCSOEO_SALCOMBE | Due 2029-30 | NORTH SANDS SPST_PSCSOEO_SALCOMBE |
| 08SW101308 · a | EnvAct_IMP2 | Improvement | Reduction of spills to meet EnvAct_IMP drivers SHADYCOMBE TANK_CSOEO_SALCOMBE | Due 2029-30 | SHADYCOMBE TANK_CSOEO_SALCOMBE |
| 08SW101611 · a | EnvAct_IMP3 | Improvement | Reduction of spills to meet EnvAct_IMP drivers SHADYCOMBE TK LOWER TUNNELS_CSO_SALCOMBE | Due 2029-30 | SHADYCOMBE TK LOWER TUNNELS_CSO_SALCOMBE |
20 of 20 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.