← Brent Mill, South Brent

Spill evidence · River Hub

Brent Mill, South Brent

Combined sewer overflow · SBB00150 · feeds SOUTH BRENT STW
No rain data

The discharge

Spill day
Thursday, 22 February 2024
Started
22 Feb 2024, 06:06
Ended
22 Feb 2024, 06:28
Duration
22 minutes
Receiving water
Avon - Upper
Parish
South Brent

Rainfall evidence

Daily rainfall at the matched gauge (White Barrow) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
22/02/2024 (spill day)no data
21/02/2024no data
20/02/2024no data
19/02/2024no data
18/02/2024no data

River flow that day: 22.217 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 7.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Bigbury and Avon
Ahead of the works
No — the works was also overflowing that day.
EA annual return (2024)
56 counted spills · 157 h total
Monitor uptime (2024)
98% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00150). Rainfall: EA Hydrology gauge d4553d75-862e-4436-8cfa-ff5b216f04bb. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by South Devon Avon Data.
Spill evidence — Brent Mill, South Brent — South Devon Avon Data