Who is fixing it

Reduction tracker

Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.

The Storm Overflows Discharge Reduction Plan covers England only. The Anglesey is in Wales, which sets its own storm overflow targets. The figures below still show how often each overflow spills against its own baseline and against 10 spills a year, but that cap is England’s. Welsh annual returns start in 2022, so the baseline here is each overflow’s 2022 figure, not 2020.

What the plan is, and what it leaves out

The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:

  • By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
  • By 2045 — the remaining high-priority overflows.
  • By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.

The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the EDM record: each overflow's counted spills per year — the standard 12/24-hour block figure, the same basis the cap is written in — against its 2022 baseline (the first Welsh annual return) and the 2050 cap of ~10, with the deadline its location implies.

39
Above the 2050 cap
of 55 tracked
29
Rising since baseline
trend is the wrong way
0
On a 2035 deadline
near a bathing water
16
Within the cap
≤10 spills in 2025

Every overflow against its cap

Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.

OverflowDeadlineBaselineLatestSince baselinevs capTrajectoryVerdict
Llanfachraeth Wwtw Overflow
DCWW1681
20506 ·22
366
0 events
+6000%36.6×Rising
Bryngwran Wwtw Overflow
DCWW1606
2050231 ·22
192
0 events
-17%19.2×Falling — behind
Green Terrace Llangaffo Storm Overflow
DCWW1757
20505 ·22
121
0 events
+2320%12.1×Rising
Aberffraw Wwtw Storm Overflow
DCWW02
2050185 ·22
107
0 events
-42%10.7×Falling — behind
Llangaffo Wwtw Storm Overflow
DCWW1216
205066 ·22
104
0 events
+58%10.4×Rising
Rhosybol Gorslwyd Storm Overflow
DCWW1837
2050110 ·22
96
0 events
-13%9.6×Falling — behind
Holyhead Porth Y Felin Storm Overflow
DCWW294
205087 ·22
87
0 events
0%8.7×Falling — behind
Pentraeth Wwtw Storm Overflow
DCWW814
205067 ·22
86
0 events
+28%8.6×Rising
Waterside Holyhead Storm Overflow
DCWW241
20507 ·22
84
0 events
+1100%8.4×Rising
Newborough Wwtw Storm Overflow
DCWW837
205019 ·22
82
0 events
+332%8.2×Rising
London Road Valley Storm Overflow
DCWW1191
205079 ·22
82
0 events
+4%8.2×Rising
Llandegfan Menai Bridge Storm Overflow
DCWW1838
205063 ·22
72
0 events
+14%7.2×Rising
Talwrn Llangefni Storm Overflow
DCWW740
205018 ·22
63
0 events
+250%6.3×Rising
Menai Suspension Bridge No 3 Overflow
DCWW2022
2050109 ·22
60
0 events
-45%6×Falling — behind
Gorad Beach Road Storm Overflow
DCWW371
205022 ·22
60
0 events
+173%6×Rising
Star Gaerwen Storm Overflow
DCWW1877
205021 ·22
58
0 events
+176%5.8×Rising
Pont Y Crug Llanddaniel Storm Overflow
DCWW2013
205032 ·22
57
0 events
+78%5.7×Rising
Gorsllwyd Llanddona Storm Overflow
DCWW1758
205060 ·22
53
0 events
-12%5.3×Falling — behind
Llangoed Lleiniog Overflow
DCWW268
205030 ·22
52
0 events
+73%5.2×Rising
Copperfield Close Four Mile Bridge Storm Overflow
DCWW12
205035 ·22
52
0 events
+49%5.2×Rising
Bae Trearthur Isallt Bach Overflow
DCWW102
205023 ·22
51
0 events
+122%5.1×Rising
Llanfaelog Storm Overflow
DCWW273
20509 ·22
51
0 events
+467%5.1×Rising
Afon Goch Lon Parys Amlwch Storm Overflow
DCWW717
205030 ·22
50
0 events
+67%5×Rising
Hermon Malltraeth Storm Overflow
DCWW1691
205072 ·22
49
0 events
-32%4.9×Falling — behind
Cycle Way Llangefni Storm Overflow
DCWW623
205036 ·22
46
0 events
+28%4.6×Rising
Holyhead Bae Trearthur No2 Storm Overflow
DCWW292
205031 ·22
42
0 events
+35%4.2×Rising
Llanfechell Wwtw Storm Overflow
DCWW1219
205068 ·22
41
0 events
-40%4.1×Falling — behind
Gwalchmai Wwtw Storm Overflow
DCWW1266
20506 ·22
33
0 events
+450%3.3×Rising
Plas Y Ffrwd Rhosybol Storm Overflow
DCWW2304
205022 ·22
29
0 events
+32%2.9×Rising
Bodedern Main Storm Overflow
DCWW1368
20500 ·22
25
0 events
—2.5×Rising
Amlwch Port Storm Overflow
DCWW1385
205034 ·22
22
1 events
-35%2.2×Falling — behind
Malltraeth Overflow
DCWW1953
20500 ·22
22
0 events
—2.2×Rising
Llandegfan Rhianfa Overflow
DCWW281
205017 ·22
22
0 events
+29%2.2×Rising
Llangefni Main Storm Overflow
DCWW895
20509 ·22
22
1 events
+144%2.2×Rising
Fryars Bay Llanfaes Overflow
DCWW599
20500 ·22
22
0 events
—2.2×Rising
Fford Cae Sel Storm Overflow
DCWW1297
205014 ·22
19
0 events
+36%1.9×Rising
Beaumaris West End Overflow
DCWW119
205022 ·22
16
0 events
-27%1.6×Falling — behind
Pont Y Brenin Overflow
DCWW1803
20509 ·22
13
0 events
+44%1.3×Rising
Holyhead Hibernia Row Storm Overflow
DCWW295
20502 ·22
11
0 events
+450%1.1×Rising
Millbank Storm Overflow
DCWW1998
20500 ·22
10
0 events
—1×Within the cap
Lon Gardener Valley Overflow
DCWW883
205023 ·22
7
0 events
-70%0.7×Within the cap
Glyn Garth Overflow
DCWW1274
205020 ·22
7
0 events
-65%0.7×Within the cap
Gaerwen Wwtw Storm Overflow
DCWW598
20506 ·25
6
1 events
0%0.6×—Within the cap
Pentraeth Tan Y Graig Storm Overflow
DCWW15
20502 ·22
2
0 events
0%0.2×Within the cap
Aberffraw Storm Overflow
DCWW03
20500 ·22
2
0 events
—0.2×Within the cap
Llangoed Cynlais Overflow
DCWW269
20504 ·22
1
0 events
-75%0.1×Within the cap
Llangefni Wwtw Storm Overflow
DCWW1215
20501 ·25
1
1 events
0%0.1×—Within the cap
Llanfaes Overflow
DCWW1989
20504 ·22
1
0 events
-75%0.1×Within the cap
Arosfa Road Dwyran Storm Overflow
DCWW2050
20501 ·25
1
1 events
0%0.1×—Within the cap
Penrhos Beach Holyhead Storm Overflow
DCWW1749
20500 ·22
1
0 events
—0.1×Within the cap
Llansadwrn Anglesey Storm Overflow
DCWW1202
20500 ·22
1
0 events
—0.1×Within the cap
Bae Trearthur Lon Isallt Storm Overflow
DCWW369
20500 ·22
0
0 events
—0×Within the cap
Gorwelion Road Newlands Beach Storm Overflow
DCWW1858
20500 ·22
0
0 events
—0×Within the cap
Gwalchmai Isaf Storm Overflow
DCWW1908
205029 ·22
0
0 events
-100%0×Within the cap
Menai Bridge Porth Wrach No 2 Overflow
DCWW2338
20500 ·22
0
0 events
—0×Within the cap

What this is — and what it is not

This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2022 baseline and the 10/year cap. Counted spills use the standard 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →