Who is fixing it

What the regulator requires

A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

72
Measures in this catchment
WINEP, current record
72
Still active
not yet past their date
0
Assumed complete
completion date has passed
26
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
08SO102401 · aU_MON4Monitoring
U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring
Ashington WTW
Due 2026-27Honeybridge Stream
08SO102677 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
ASHINGTON WWTW
Due 2026-27Honeybridge Stream
08SO102404 · aU_MON4Monitoring
U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring
Barns Green WTW
Due 2026-27BARNS GREEN
08SO102681 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
BARNS GREEN WWTW
Due 2026-27Adur West
08SO102427 · aU_MON4Monitoring
U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring
Cowfold WTW
Due 2026-27COWFOLD
08SO102723 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
COWFOLD WWTW
Due 2026-27Cowfold Stream
08SO102428 · aU_MON4Monitoring
U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils
Ditchling WTW
Due 2026-27DITCHLING
08SO102488 · aU_MON4Monitoring
U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring
Goddards Green WTW
Due 2026-27Adur East (Goddards Green)
08SO102758 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
GODDARDS GREEN WWTW
Due 2026-27Adur East (Goddards Green)
08SO102779 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
HENFIELD WWTW
Due 2026-27Chess Stream
08SO102477 · aU_MON4Monitoring
U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils
Monks Gate WTW
Due 2026-27MONKS GATE
08SO102819 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
MONKS GATE WWTW
Due 2026-27Blakes Gill
08SO102826 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
NEWBURY LANE CUCKFIELD WWTW
Due 2026-27Copyhold Stream
08SO102836 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
PARTRIDGE GREEN WWTW
Due 2026-27Adur East (Sakeham)
08SO102484 · aU_MON4Monitoring
U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring
Small Dole WTW
Due 2026-27SMALL DOLE
08SO102878 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
SMALL DOLE WWTW
Due 2026-27Woodsmill Stream
08SO102588 · aU_MON4Monitoring
U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils
STEYNING WTW
Due 2026-27Black Sewer
08SO102890 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
STEYNING WWTW
Due 2026-27Black Sewer
08SO102599 · aU_MON4Monitoring
U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils
Wivelsfield WTW
Due 2026-27WIVELSFIELD
08SO102933 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
WIVELSFIELD WWTW
Due 2026-27Adur (Burgess Hill)
08SO101069 · bWFD_NDLS_Chem1No deterioration
Prevent any deterioration
Burgess Hill (Goddards Green)
Due 2026-27Adur (Burgess Hill)
08SO103792 · aWFD_INVInvestigation
Investigations for actions to improve water quality in terms of relevant WFD status objectives.
ANSTY WTW
Due 2027-28Adur East (Goddards Green)
08SO104950 · owEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
ASHINGTON SSO
Due 2027-28Honeybridge Stream
08SO103794 · aWFD_INVInvestigation
Investigations for actions to improve water quality in terms of relevant WFD status objectives.
BARNS GREEN WTW
Due 2027-28BARNS GREEN
08SO103796 · aWFD_INVInvestigation
Investigations for actions to improve water quality in terms of relevant WFD status objectives.
COOLHAM WTW
Due 2027-28Adur West
08SO104950 · rgEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
CUCKFIELD ROAD HURSTPIERPOINT CEO
Due 2027-28Herrings Stream
08SO104950 · roEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
CUCKFIELD ROAD HURSTPIERPOINT CSO
Due 2027-28Herrings Stream
08SO104950 · riEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
FAIRPLACE HILL BURGESS HILL CEO
Due 2027-28Adur (Burgess Hill)
08SO104950 · rrEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
FOXHILL HAYWARDS HEATH CEO
Due 2027-28Adur (Burgess Hill)
08SO104950 · saEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
FREEKS LANE BURGESS HILL CSO
Due 2027-28Adur (Burgess Hill)
08SO104950 · ooEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
GODDARDS GREEN SSO
Due 2027-28Adur East (Goddards Green)
08SO104026 · aWFD_INVInvestigation
Investigate the cause of the spills
Goddards Green WTW WFD_INV
Due 2027-28Adur East (Goddards Green)
08SO104950 · rsEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
LONDON ROAD BEXHILL CSO
Due 2027-28Adur (Burgess Hill)
08SO104950 · qzEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
MALTHOUSE LANE BURGESS HILL CEO
Due 2027-28Herrings Stream
08SO104950 · ovEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
MONKS GATE SSO
Due 2027-28Blakes Gill
08SO104950 · ceEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
POYNINGS SSO
Due 2027-28Woodsmill Stream
08SO104950 · rlEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
RUMBOLDS LANE HAYWARDS HEATH CSO
Due 2027-28Adur (Burgess Hill)
08SO103817 · aWFD_INVInvestigation
Investigations for actions to improve water quality in terms of relevant WFD status objectives.
SHIPLEY WTW
Due 2027-28Adur West
08SO104950 · pxEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
SMALL DOLE SSO
Due 2027-28Woodsmill Stream
08SO104950 · qvEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
WILLOW WAY HURSTPIERPOINT CSO
Due 2027-28Herrings Stream
08SO104950 · qeEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
WIVELSFIELD SSO
Due 2027-28Adur (Burgess Hill)
08SO103823 · aWFD_INVInvestigation
Investigations for actions to improve water quality in terms of relevant WFD status objectives.
WIVELSFIELD WTW
Due 2027-28WIVELSFIELD
08SO103902 · aEnvAct_IMP2Improvement
SuDS + Storage
ASHINGTON SSO
Due 2029-30Honeybridge Stream
08SO104071 · aWFD_IMPgImprovement
Amend Total P permit
BARNS GREEN
Due 2029-30BARNS GREEN
08SO101069 · aWFD_IMP_CHEMImprovement
Deliver a physical improvement
Burgess Hill (Goddards Green)
Due 2029-30Adur (Burgess Hill)
08SO101069 · cWFD_ND_CHEM4No deterioration
Prevent any deterioration
Burgess Hill (Goddards Green)
Due 2029-30Adur (Burgess Hill)
08SO104076 · aWFD_IMPgImprovement
Amend Total P permit
COOLHAM
Due 2029-30Adur West
08SO104078 · aWFD_IMPmImprovement
Amend Total P permit
COWFOLD
Due 2029-30COWFOLD
08SO103247 · aEnvAct_IMP2Improvement
SuDS + Storage
CUCKFIELD ROAD HURSTPIERPOINT CEO
Due 2029-30Herrings Stream
08SO103266 · aEnvAct_IMP2Improvement
SuDS + Storage
CUCKFIELD ROAD HURSTPIERPOINT CSO
Due 2029-30Herrings Stream
08SO104799 · aWFD_IMPgImprovement
Amend Total P permit limit
Dial Post
Due 2029-30Adur (Lancing brook)
08SO104081 · aWFD_IMPmImprovement
Amend Total P permit
DITCHLING
Due 2029-30DITCHLING
08SO103252 · aEnvAct_IMP2Improvement
SuDS + Storage
FAIRPLACE HILL BURGESS HILL CEO
Due 2029-30Adur (Burgess Hill)
08SO103270 · aEnvAct_IMP2Improvement
SuDS + Storage
FOXHILL HAYWARDS HEATH CEO
Due 2029-30Adur (Burgess Hill)
08SO103287 · aEnvAct_IMP2Improvement
SuDS + Storage
FREEKS LANE BURGESS HILL CSO
Due 2029-30Adur (Burgess Hill)
08SO104034 · bWFD_NDNo deterioration
Amend WFD ND BOD permit
HENFIELD
Due 2029-30Chess Stream
08SO104034 · aWFD_NDNo deterioration
Amend WFD ND Ammonia permit
HENFIELD
Due 2029-30Chess Stream
08SO104800 · aWFD_IMPgImprovement
Amend Total P permit limit
Itchingfield
Due 2029-30Adur West
08SO104800 · bU_IMP1Improvement
Replace descriptive with numerical BOD and SS permits
Itchingfield WTW
Due 2029-30Adur West
08SO103932 · aEnvAct_IMP2Improvement
SuDS + Storage
LONDON ROAD BEXHILL CSO
Due 2029-30Adur (Burgess Hill)
08SO104087 · aWFD_IMPgImprovement
Amend Total P permit
LOWER BEEDING
Due 2029-30Cowfold Stream
08SO103966 · aEnvAct_IMP2Improvement
SuDS + Storage
MALTHOUSE LANE BURGESS HILL CEO
Due 2029-30Herrings Stream
08SO104039 · aWFD_NDNo deterioration
Amend WFD ND BOD permit
NEWBURY LANE CUCKFIELD WTW
Due 2029-30Copyhold Stream
08SO104019 · aWFD_IMPgImprovement
Amend Total P permit
PARTRIDGE GREEN
Due 2029-30Adur East (Sakeham)
08SO103261 · aEnvAct_IMP2Improvement
SuDS + Storage
RUMBOLDS LANE HAYWARDS HEATH CSO
Due 2029-30Adur (Burgess Hill)
08SO104099 · aWFD_IMPgImprovement
Amend Total P permit
SHIPLEY
Due 2029-30Adur West
08SO104099 · bU_IMP1Improvement
Replace descriptive with numerical BOD and SS permits
Shipley WTW
Due 2029-30Adur West
08SO103916 · aEnvAct_IMP2Improvement
SuDS + Storage
SMALL DOLE SSO
Due 2029-30Woodsmill Stream
08SO104101 · aWFD_IMPmImprovement
Amend Total P permit
STEYNING
Due 2029-30Black Sewer
08SO103943 · aEnvAct_IMP2Improvement
SuDS + Storage
WILLOW WAY HURSTPIERPOINT CSO
Due 2029-30Herrings Stream
08SO103919 · aEnvAct_IMP2Improvement
SuDS + Storage
WIVELSFIELD SSO
Due 2029-30Adur (Burgess Hill)
08SO103901 · aEnvAct_IMP2Improvement
Wetland + Lining
MONKS GATE SSO
Due 2034-35Blakes Gill

72 of 72 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.