← Stewkley STW

Spill evidence · River Hub

Stewkley STW

Storm overflow at the works · TWL00391
Wet weather

The discharge

Spill day
Wednesday, 20 November 2024
Started
20 Nov 2024, 08:00
Ended
21 Nov 2024, 00:45
Duration
16 hours 45 minutes
Receiving water
Hardwick Brook (Source to Thame)
Parish
Stewkley

Rainfall evidence

Daily rainfall at the matched gauge (Drayton Parslow) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
20/11/2024 (spill day)1.4 mmrain
19/11/20246.2 mmrain
18/11/202412.4 mmrain
17/11/20244.2 mmrain
16/11/20241.6 mmrain

River flow that day: 3.612 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.9 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2024)
217 counted spills · 4482 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00391). Rainfall: EA Hydrology gauge b63d3727-cd27-48eb-b137-ed97e1a94566. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thame Data.