← Stewkley STW

Spill evidence · River Hub

Stewkley STW

Storm overflow at the works · TWL00391
Dry spill

Evidence strength

High confidence
  • ✓ Sustained discharge (≥1 h)
  • ✓ Dry across a 4-day antecedent window
  • ✓ Rain gauge close (≤5 km)
  • ✓ Monitor 100% operational that year

The discharge

Spill day
Saturday, 5 April 2025
Started
5 Apr 2025, 19:00
Ended
5 Apr 2025, 20:45
Duration
1 hour 45 minutes
Receiving water
Hardwick Brook (Source to Thame)
Parish
Stewkley

Rainfall evidence

Daily rainfall at the matched gauge (Drayton Parslow) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Dry spill4-day window: Dry spill
DateRainfall
05/04/2025 (spill day)0 mmdry
04/04/20250 mmdry
03/04/20250 mmdry
02/04/20250 mmdry
01/04/20250 mmdry

River flow that day: 1.815 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.9 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2025)
143 counted spills · 3069 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00391). Rainfall: EA Hydrology gauge b63d3727-cd27-48eb-b137-ed97e1a94566. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thame Data.
Spill evidence — Stewkley STW — River Thame Data