← Stewkley STW

Spill evidence · River Hub

Stewkley STW

Storm overflow at the works · TWL00391
Wet weather

The discharge

Spill day
Wednesday, 23 April 2025
Started
23 Apr 2025, 06:00
Ended
23 Apr 2025, 14:15
Duration
8 hours 15 minutes
Receiving water
Hardwick Brook (Source to Thame)
Parish
Stewkley

Rainfall evidence

Daily rainfall at the matched gauge (Drayton Parslow) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
23/04/2025 (spill day)0.2 mmdry
22/04/202521.2 mmrain
21/04/20251 mmrain
20/04/20252 mmrain
19/04/20250.2 mmdry

River flow that day: 6.895 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.9 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2025)
143 counted spills · 3069 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00391). Rainfall: EA Hydrology gauge b63d3727-cd27-48eb-b137-ed97e1a94566. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thame Data.
Spill evidence — Stewkley STW — River Thame Data