← Manor Farm Road (sydenham) pumping station
Spill evidence · River Hub
Manor Farm Road (sydenham) pumping station
Pumping station overflow · TWL00289 · feeds CHINNOR, CHINNOR, OXON STW"
Wet weather
The discharge
- Spill day
- Friday, 6 February 2026
- Started
- 6 Feb 2026, 12:45
- Ended
- 7 Feb 2026, 01:00
- Duration
- 12 hours 15 minutes
- Receiving water
- Chinor Brook and Sydenham Brook
- Parish
- Sydenham
Rainfall evidence
Daily rainfall at the matched gauge (Stokenchurch) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 06/02/2026 (spill day) | 5.25 mm | rain |
| 05/02/2026 | 12.83 mm | rain |
| 04/02/2026 | 1.44 mm | rain |
| 03/02/2026 | 10.54 mm | rain |
| 02/02/2026 | 0.48 mm | rain |
River flow that day: 30.619 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 5.1 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
- Ahead of the works
- No — the works was also overflowing that day.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00289). Rainfall: EA Hydrology gauge 0e46172e-b8b8-478c-94cf-33a4fdf1956f. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thame Data.