← Thame STW

Spill evidence · River Hub

Thame STW

Storm overflow at the works · TWL00409 · feeds THAME, THAME, OXON STW"
Dry spill

Evidence strength

Medium confidence
  • ✓ Long discharge (≥6 h)
  • ✓ Dry on the EA 1-day window
  • ✓ Monitor 100% operational that year

The discharge

Spill day
Tuesday, 30 April 2024
Started
30 Apr 2024, 07:45
Ended
30 Apr 2024, 23:30
Duration
15 hours 45 minutes
Receiving water
Scotsgrove Brook (upstream Kingsey Cuttle Brook)
Parish
Thame

Rainfall evidence

Daily rainfall at the matched gauge (Stokenchurch) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Wet weather4-day window: Wet weather
DateRainfall
30/04/2024 (spill day)0 mmdry
29/04/20240 mmdry
28/04/20242.01 mmrain
27/04/202433.24 mmrain
26/04/20241.92 mmrain

River flow that day: 7.156 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 10.3 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2024)
105 counted spills · 1609 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00409). Rainfall: EA Hydrology gauge 0e46172e-b8b8-478c-94cf-33a4fdf1956f. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thame Data.