← Wheatley STW

Spill evidence · River Hub

Wheatley STW

Storm overflow at the works · TWL00446 · feeds WHEATLEY, WHEATLEY, OXON STW"
Dry spill

Evidence strength

Medium confidence
  • ✓ Long discharge (≥6 h)
  • ✓ Dry across a 4-day antecedent window
  • ✓ Rain gauge close (≤5 km)
  • ⚠ Monitor only 84% operational that year — data may be incomplete

The discharge

Spill day
Friday, 12 January 2024
Started
12 Jan 2024, 09:00
Ended
13 Jan 2024, 01:45
Duration
16 hours 45 minutes
Receiving water
Thame (Scotsgrove Brook to Thames)
Parish
Wheatley

Rainfall evidence

Daily rainfall at the matched gauge (Wheatley) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Dry spill4-day window: Dry spill
DateRainfall
12/01/2024 (spill day)0 mmdry
11/01/20240 mmdry
10/01/20240 mmdry
09/01/20240 mmdry
08/01/20240 mmdry

River flow that day: 7.815 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 0.2 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2024)
160 counted spills · 3188 h total
Monitor uptime (2024)
84% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00446). Rainfall: EA Hydrology gauge 7eb546a1-8663-4d07-a9cc-e7b5f6e13006. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thame Data.
Spill evidence — Wheatley STW — River Thame Data