← Houghton Road Stockbridge Ceo - 108487

Spill evidence · River Hub

Houghton Road Stockbridge Ceo - 108487

Pumping station overflow · SWS00454 · feeds STOCKBRIDGE
Wet weather

The discharge

Spill day
Friday, 23 October 2026
Started
23 Oct 2026, 14:00
Ended
23 Oct 2026, 17:04
Duration
3 hours 3 minutes
Receiving water
Test - conf Anton to conf Dun
Parish
Longstock

Rainfall evidence

Daily rainfall at the matched gauge (Broughton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
23/10/2026 (spill day)2.61 mmrain
22/10/202634.38 mmrain
21/10/20262.57 mmrain
20/10/202621.72 mmrain
19/10/202615.09 mmrain

River flow that day: 6.028 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 4.6 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00454). Rainfall: EA Hydrology gauge cf7fa6ec-5097-4c0a-978d-1f74cc222bed. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Test Data.
Spill evidence — Houghton Road Stockbridge Ceo - 108487 — River Test Data