← The Institute Yarmouth Ceo - 108564

Spill evidence · River Hub

The Institute Yarmouth Ceo - 108564

Pumping station overflow · SWS00977 · feeds SANDOWN, VENTNOR,BEMBRIDGE STW"
Wet weather

The discharge

Spill day
Thursday, 8 January 2026
Started
8 Jan 2026, 17:51
Ended
8 Jan 2026, 18:25
Duration
33 minutes 37 seconds
Receiving water
—
Parish
Yarmouth

Rainfall evidence

Daily rainfall at the matched gauge (Afton Park) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
08/01/2026 (spill day)26.45 mmrain
07/01/20260 mmdry
06/01/20264.14 mmrain
05/01/20260.07 mmdry
04/01/20260.04 mmdry

River flow that day: 16.583 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 5.1 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Colwell Bay
Shellfish water
Lymington and Sowley; Pennington; Newtown; Yarmouth
Ahead of the works
Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00977). Rainfall: EA Hydrology gauge 5e45b2c5-20ea-4e7f-b37a-a9b220ba3946_334158. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Solent coast Data.
Spill evidence — The Institute Yarmouth Ceo - 108564 — Solent coast Data