← St Marys Road Cowes, - 108562

Spill evidence · River Hub

St Marys Road Cowes, - 108562

Pumping station overflow · SWS00815 · feeds SANDOWN, VENTNOR,BEMBRIDGE STW"
Wet weather

The discharge

Spill day
Thursday, 2 May 2024
Started
2 May 2024, 01:45
Ended
2 May 2024, 08:13
Duration
6 hours 28 minutes
Receiving water
—
Parish
Cowes

Rainfall evidence

Daily rainfall at the matched gauge (Cowes) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
02/05/2024 (spill day)0 mmdry
01/05/202413.89 mmrain
30/04/20240 mmdry
29/04/20240 mmdry
28/04/20240 mmdry

River flow that day: 15.746 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 1.1 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Cowes; Gurnard
Shellfish water
Central Solent; Cowes and Medina; Spithead and Stokes Bay; Stanswood Bay
Ahead of the works
Unknown (no works overflow data)
EA annual return (2024)
114 counted spills · 1042 h total
Monitor uptime (2024)
99% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00815). Rainfall: EA Hydrology gauge 1bc17e8e-1962-43d1-8618-278efe8838d1. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Solent coast Data.