← Marsh Road Gurnard Ceo - 107441

Spill evidence · River Hub

Marsh Road Gurnard Ceo - 107441

Pumping station overflow · SWS00381 · feeds SANDOWN, VENTNOR,BEMBRIDGE STW"
Wet weather

The discharge

Spill day
Wednesday, 3 September 2025
Started
3 Sept 2025, 02:35
Ended
3 Sept 2025, 05:21
Duration
2 hours 46 minutes
Receiving water
—
Parish
Gurnard

Rainfall evidence

Daily rainfall at the matched gauge (Cowes) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
03/09/2025 (spill day)12.33 mmrain
02/09/202521.54 mmrain
01/09/20257.9 mmrain
31/08/20251.47 mmrain
30/08/20259.33 mmrain

River flow that day: 2.6 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 1.9 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Cowes; Gurnard
Shellfish water
Cowes and Medina; Lepe Middle Bank; Lymington and Sowley; Newtown
Ahead of the works
Unknown (no works overflow data)
EA annual return (2025)
22 counted spills · 131 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00381). Rainfall: EA Hydrology gauge 1bc17e8e-1962-43d1-8618-278efe8838d1. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Solent coast Data.
Spill evidence — Marsh Road Gurnard Ceo - 107441 — Solent coast Data