← Crofton Road, Sunnydale

Spill evidence · River Hub

Crofton Road, Sunnydale

Combined sewer overflow · TWL00125 · feeds LONDON (Long Reach STW)
Wet weather

The discharge

Spill day
Sunday, 8 September 2024
Started
8 Sept 2024, 01:15
Ended
8 Sept 2024, 02:15
Duration
1 hour
Receiving water
Quaggy
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (New Addington) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
08/09/2024 (spill day)1 mmrain
07/09/20247.4 mmrain
06/09/20241.2 mmrain
05/09/202416 mmrain
04/09/20242.2 mmrain

River flow that day: 1.789 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 4.5 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2024)
53 counted spills · 224 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00125). Rainfall: EA Hydrology gauge 2eed6df0-bf20-473d-b361-bbe6ff0bd85b. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Ravensbourne Data.
Spill evidence — Crofton Road, Sunnydale — River Ravensbourne Data