← South Norwood

Spill evidence · River Hub

South Norwood

Combined sewer overflow · TWL00379 · feeds LONDON (Long Reach STW)
Wet weather

The discharge

Spill day
Saturday, 19 July 2025
Started
19 Jul 2025, 11:15
Ended
19 Jul 2025, 11:45
Duration
30 minutes
Receiving water
Pool River
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Beckenham College) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
19/07/2025 (spill day)4.28 mmrain
18/07/202510.12 mmrain
17/07/20250.04 mmdry
16/07/20250 mmdry
15/07/20251.04 mmrain

River flow that day: 0.914 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 2.3 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2025)
4 counted spills · 5 h total
Monitor uptime (2025)
95% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00379). Rainfall: EA Hydrology gauge bb3f6cc2-1a9d-4f20-9012-79a612ba20a2. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Ravensbourne Data.