← South Norwood

Spill evidence · River Hub

South Norwood

Combined sewer overflow · TWL00379 · feeds LONDON (Long Reach STW)
Dry spill

Evidence strength

High confidence
  • ✓ Sustained discharge (≥1 h)
  • ✓ Dry across a 4-day antecedent window
  • ✓ Rain gauge close (≤5 km)

The discharge

Spill day
Sunday, 22 March 2026
Started
22 Mar 2026, 08:15
Ended
22 Mar 2026, 11:00
Duration
2 hours 45 minutes
Receiving water
Pool River
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Beckenham College) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Dry spill4-day window: Dry spill
DateRainfall
22/03/2026 (spill day)0 mmdry
21/03/20260.03 mmdry
20/03/20260.05 mmdry
19/03/20260.03 mmdry
18/03/20260.02 mmdry

River flow that day: 3.855 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 2.3 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00379). Rainfall: EA Hydrology gauge bb3f6cc2-1a9d-4f20-9012-79a612ba20a2. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Ravensbourne Data.