← Poole Woodlands Ave/hinchliffe Road O/f

Spill evidence · River Hub

Poole Woodlands Ave/hinchliffe Road O/f

Combined sewer overflow · WXW00543 · feeds POOLE STW
Wet weather

The discharge

Spill day
Friday, 29 August 2025
Started
29 Aug 2025, 04:48
Ended
29 Aug 2025, 06:45
Duration
1 hour 57 minutes
Receiving water
Sherford River
Parish
Arne

Rainfall evidence

Daily rainfall at the matched gauge (Alderney) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
29/08/2025 (spill day)0.73 mmrain
28/08/202528.76 mmrain
27/08/20250.76 mmrain
26/08/20250.44 mmrain
25/08/20250.53 mmrain

River flow that day: 1.006 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.3 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Poole Bay; Poole Harbour North; Poole Harbour South; Poole Harbour West
Ahead of the works
Unknown (no works overflow data)
EA annual return (2025)
8 counted spills · 22 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00543). Rainfall: EA Hydrology gauge e01eaf91-3a94-47d2-a987-d24706fec3bd. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Poole Harbour Rivers Data.
Spill evidence — Poole Woodlands Ave/hinchliffe Road O/f — Poole Harbour Rivers Data