← Park Mill Road Ammanford Storm Overflow
Spill evidence · River Hub
Park Mill Road Ammanford Storm Overflow
Combined sewer overflow · DCWW2077 · feeds AMMANFORD STW
Wet weather
The discharge
- Spill day
- Saturday, 24 October 2026
- Started
- 24 Oct 2026, 16:15
- Ended
- 24 Oct 2026, 16:45
- Duration
- 29 minutes 34 seconds
- Receiving water
- Loughor - headwaters to confluence with Aman
- Community
- Llandybie
Rainfall evidence
Daily rainfall at the matched gauge (Garnswllt Raingauge) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 24/10/2026 (spill day) | 39.2 mm | rain |
| 23/10/2026 | 18.8 mm | rain |
| 22/10/2026 | 15.8 mm | rain |
| 21/10/2026 | 12.6 mm | rain |
| 20/10/2026 | 0.2 mm | dry |
River flow that day: 10.378 m³/s.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 2.1 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not a bathing-water overflow
- Shellfish water
- Not a shellfish-water overflow
- Ahead of the works
- Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest NRW gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Dŵr Cymru Welsh Water live storm overflow feed, read hourly by River Hub (outlet DCWW2077). Rainfall: NRW telemetry gauge H059498721. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Afon Llwchwr / River Loughor Data.