← Ash Ridge (wokingham) STW

Spill evidence · River Hub

Ash Ridge (wokingham) STW

Storm overflow at the works · TWL00459 · feeds WOKINGHAM , BERKS STW"
Dry spill

Evidence strength

Medium confidence
  • ✓ Sustained discharge (≥1 h)
  • ✓ Dry on the EA 1-day window
  • ✓ Rain gauge close (≤5 km)
  • ✓ Monitor 100% operational that year

The discharge

Spill day
Friday, 18 October 2024
Started
18 Oct 2024, 04:45
Ended
18 Oct 2024, 07:15
Duration
2 hours 30 minutes
Receiving water
Emm Brook
Parish
Wokingham

Rainfall evidence

Daily rainfall at the matched gauge (Bracknell) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Wet weather4-day window: Wet weather
DateRainfall
18/10/2024 (spill day)0 mmdry
17/10/20240 mmdry
16/10/20241.93 mmrain
15/10/20242.23 mmrain
14/10/20247.74 mmrain

River flow that day: 15.215 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 4.9 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2024)
74 counted spills · 472 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00459). Rainfall: EA Hydrology gauge 68fd3385-553f-44cc-b69d-c94eafad4bf4. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Loddon Data.