← St Stephens Hall (little London) pumping station

Spill evidence · River Hub

St Stephens Hall (little London) pumping station

Pumping station overflow · TWL00319 · feeds SILCHESTER, SILCHESTER, HANTS STW"
Wet weather

The discharge

Spill day
Saturday, 21 February 2026
Started
21 Feb 2026, 01:46
Ended
21 Feb 2026, 02:12
Duration
26 minutes
Receiving water
Bow Brook (Pamber End to Bramley)
Parish
Pamber

Rainfall evidence

Daily rainfall at the matched gauge (Basingstoke) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
21/02/2026 (spill day)0.98 mmrain
20/02/20261.61 mmrain
19/02/20260.01 mmdry
18/02/202612.75 mmrain
17/02/20260 mmdry

River flow that day: 14.307 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.7 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00319). Rainfall: EA Hydrology gauge 68bce64a-5efe-4018-87fb-88b37423a83e. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Loddon Data.