← Basingstoke STW

Spill evidence · River Hub

Basingstoke STW

Storm overflow at the works · TWL00028 · feeds BASINGSTOKE, WILDMOOR, BASINGST STW"
Dry spill

Evidence strength

Medium confidence
  • ✓ Sustained discharge (≥1 h)
  • ✓ Dry on the EA 1-day window
  • ✓ Rain gauge close (≤5 km)
  • ✓ Monitor 100% operational that year

The discharge

Spill day
Monday, 18 March 2024
Started
18 Mar 2024, 13:30
Ended
18 Mar 2024, 14:45
Duration
1 hour 15 minutes
Receiving water
Loddon (Basingstoke to River Lyde confluence at Hartley Wespall)
Parish
Old Basing and Lychpit

Rainfall evidence

Daily rainfall at the matched gauge (Basingstoke) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Wet weather4-day window: Wet weather
DateRainfall
18/03/2024 (spill day)0.12 mmdry
17/03/20240.06 mmdry
16/03/20244.24 mmrain
15/03/20240.21 mmdry
14/03/20243.61 mmrain

River flow that day: 10.888 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 0.3 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2024)
82 counted spills · 938 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00028). Rainfall: EA Hydrology gauge 68bce64a-5efe-4018-87fb-88b37423a83e. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Loddon Data.