← Mill Lane Kennington Ceo - 108684

Spill evidence · River Hub

Mill Lane Kennington Ceo - 108684

Pumping station overflow · SWS00571 · feeds ASHFORD STW
Wet weather

The discharge

Spill day
Friday, 9 January 2026
Started
9 Jan 2026, 11:28
Ended
11 Jan 2026, 01:26
Duration
1 day 13 hours
Receiving water
Great Stour between Ashford and Wye
Parish
Kennington

Rainfall evidence

Daily rainfall at the matched gauge (Bybrook) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
09/01/2026 (spill day)7.37 mmrain
08/01/202633.81 mmrain
07/01/20261.59 mmrain
06/01/202610.74 mmrain
05/01/20260.01 mmdry

River flow that day: 15.709 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 2.3 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00571). Rainfall: EA Hydrology gauge fa56d591-cb61-430a-93d8-2fe37150a99b. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Kent Stour Data.