← Hospital Farm Harbledown Ceo - 108659
Spill evidence · River Hub
Hospital Farm Harbledown Ceo - 108659
Pumping station overflow · SWS00453 · feeds CANTERBURY STW
Wet weather
The discharge
- Spill day
- Monday, 8 June 2026
- Started
- 8 Jun 2026, 15:17
- Ended
- 8 Jun 2026, 15:37
- Duration
- 20 minutes 23 seconds
- Receiving water
- Whitehall Dyke at Harbledown
- Parish
- Harbledown and Rough Common
Rainfall evidence
Daily rainfall at the matched gauge (Canterbury Uni) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 08/06/2026 (spill day) | 8.21 mm | rain |
| 07/06/2026 | 0.02 mm | dry |
| 06/06/2026 | 5.25 mm | rain |
| 05/06/2026 | 0.79 mm | rain |
| 04/06/2026 | 1.39 mm | rain |
River flow that day: 2.058 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 2.0 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
- Ahead of the works
- Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00453). Rainfall: EA Hydrology gauge ff45977a-d2d0-4eeb-9b59-3ee36b61ad2f. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Kent Stour Data.