← Imperial Road Mount Pleasant Ceo - 111369

Spill evidence · River Hub

Imperial Road Mount Pleasant Ceo - 111369

Pumping station overflow · SWS00462 · feeds SOUTHAMPTON WEST (MILLBROOK) STW
Wet weather

The discharge

Spill day
Friday, 5 June 2026
Started
5 Jun 2026, 03:29
Ended
5 Jun 2026, 04:26
Duration
56 minutes 53 seconds
Receiving water
Monks Brook
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Portswood) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
05/06/2026 (spill day)7.26 mmrain
04/06/20264.68 mmrain
03/06/20263.4 mmrain
02/06/202620.73 mmrain
01/06/202632.45 mmrain

River flow that day: 1.918 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 1.8 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Southampton Water
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00462). Rainfall: EA Hydrology gauge eb5d2f5c-f57e-4272-9cf2-cb130d6a8b54. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Itchen Data.