← Newham Road pumping station, Truro

Spill evidence · River Hub

Newham Road pumping station, Truro

Pumping station overflow · SBB00992 · feeds TRURO (NEWHAM) STW
Dry spill

Evidence strength

High confidence
  • ✓ Sustained discharge (≥1 h)
  • ✓ Dry across a 4-day antecedent window
  • ✓ Rain gauge close (≤5 km)
  • ✓ Monitor 100% operational that year

The discharge

Spill day
Thursday, 12 December 2024
Started
12 Dec 2024, 08:15
Ended
12 Dec 2024, 09:46
Duration
1 hour 30 minutes
Receiving water
Kenwyn
Parish
Truro

Rainfall evidence

Daily rainfall at the matched gauge (Truro) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Dry spill4-day window: Dry spill
DateRainfall
12/12/2024 (spill day)0 mmdry
11/12/20240 mmdry
10/12/20240 mmdry
09/12/20240 mmdry
08/12/20240 mmdry

River flow that day: 6.794 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 1.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Fal Estuary
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2024)
13 counted spills · 11 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00992). Rainfall: EA Hydrology gauge 0eb77beb-d98e-48f1-9e2d-e494be9b5354. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Fal Data.