← Town Hill, Ermington

Spill evidence · River Hub

Town Hill, Ermington

Combined sewer overflow · SBB00911 · feeds ERMINGTON_STW_PLYMOUTH
Wet weather

The discharge

Spill day
Saturday, 9 March 2024
Started
9 Mar 2024, 17:09
Ended
9 Mar 2024, 17:51
Duration
41 minutes 20 seconds
Receiving water
Lower Erme
Parish
Ermington

Rainfall evidence

Daily rainfall at the matched gauge (Plympton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
09/03/2024 (spill day)27.7 mmrain
08/03/20240.9 mmrain
07/03/20240 mmdry
06/03/20240 mmdry
05/03/20240.1 mmdry

River flow that day: 16.762 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 5.6 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Mothecombe; Coastguards Beach, Erme Estuary
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2024)
49 counted spills · 263 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00911). Rainfall: EA Hydrology gauge b779beab-751f-439d-bd30-0f79b866a399. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Erme Data.