← Wimborne Brook Road Storm Tank
Spill evidence · River Hub
Wimborne Brook Road Storm Tank
Storm overflow at the works · WXW01264 · feeds WIMBORNE STW
Wet weather
The discharge
- Spill day
- Wednesday, 11 February 2026
- Started
- 11 Feb 2026, 00:20
- Ended
- 11 Feb 2026, 00:38
- Duration
- 18 minutes
- Receiving water
- Stour (Lower)
- Parish
- Wimborne Minster
Rainfall evidence
Daily rainfall at the matched gauge (Alderney) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 11/02/2026 (spill day) | 5.65 mm | rain |
| 10/02/2026 | 5.86 mm | rain |
| 09/02/2026 | 12.95 mm | rain |
| 08/02/2026 | 4.12 mm | rain |
| 07/02/2026 | 6.21 mm | rain |
River flow that day: 22.053 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 4.5 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW01264). Rainfall: EA Hydrology gauge e01eaf91-3a94-47d2-a987-d24706fec3bd. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Dorset Stour Data.