← Charlton Musgrove Barrow Lane

Spill evidence · River Hub

Charlton Musgrove Barrow Lane

Storm overflow at the works · WXW00253 · feeds CHARLTON MUSGROVE STW CATCHMENT
Wet weather

The discharge

Spill day
Sunday, 1 March 2026
Started
1 Mar 2026, 09:54
Ended
1 Mar 2026, 10:16
Duration
22 minutes
Receiving water
Cale
Parish
Charlton Musgrove

Rainfall evidence

Daily rainfall at the matched gauge (Penridge) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
01/03/2026 (spill day)0.8 mmrain
28/02/20261.38 mmrain
27/02/20266.99 mmrain
26/02/20266.84 mmrain
25/02/20260.01 mmdry

River flow that day: 10.432 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 2.2 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00253). Rainfall: EA Hydrology gauge 533132ce-7d11-4b33-b959-ff8fa7cdc5bb. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Dorset Stour Data.
Spill evidence — Charlton Musgrove Barrow Lane — River Dorset Stour Data