← Gillingham Buckingham Road

Spill evidence · River Hub

Gillingham Buckingham Road

Pumping station overflow · WXW00207 · feeds GILLINGHAM STW
Wet weather

The discharge

Spill day
Wednesday, 23 April 2025
Started
23 Apr 2025, 02:39
Ended
23 Apr 2025, 03:04
Duration
25 minutes
Receiving water
Stour (Headwaters)
Parish
Gillingham

Rainfall evidence

Daily rainfall at the matched gauge (Gillingham Common Mead Lane) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
23/04/2025 (spill day)0 mmdry
22/04/20259.52 mmrain
21/04/20251.26 mmrain
20/04/20250 mmdry
19/04/20250.01 mmdry

River flow that day: 6.895 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 0.7 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2025)
32 counted spills · 184 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00207). Rainfall: EA Hydrology gauge 71ad8409-f13d-4b7c-a2bb-23df4049f394. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Dorset Stour Data.
Spill evidence — Gillingham Buckingham Road — River Dorset Stour Data