← Exton South pumping station, Exmouth

Spill evidence · River Hub

Exton South pumping station, Exmouth

Pumping station overflow · SBB00435 · feeds EXETER STW
Wet weather

The discharge

Spill day
Sunday, 22 November 2026
Started
22 Nov 2026, 05:29
Ended
ongoing
Duration
—
Receiving water
Polly Brook
Parish
Woodbury

Rainfall evidence

Daily rainfall at the matched gauge (Woodbury) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
22/11/2026 (spill day)15.39 mmrain
21/11/20268.54 mmrain
20/11/20260 mmdry
19/11/202614.23 mmrain
18/11/20261.69 mmrain

River flow that day: 12.437 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 2.8 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Exe Estuary
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00435). Rainfall: EA Hydrology gauge cb133ca8-a246-41c8-8e97-2ded6aa1f7b5. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Clyst & Culm Data.
Spill evidence — Exton South pumping station, Exmouth — Clyst & Culm Data